Schedule ‘S’ Demystified

Date: February 19

Facilitator: Thor Tandy P.Eng, Struct.Eng, Principal Engineer at UNISOL Engineering Ltd

Schedule ‘S’ has been in existence for a number of years, however, there still seems to be some confusion with regard to the scope of use. Schedules S-B and S-C are not to be confused with the British Columbia Building Code and Vancouver’s Building Bylaw (together, the Code) mandated Letters of Assurance (LOA) and are not intended to be submitted to the Authority Having Jurisdiction (AHJ). There may (or may not) be reasons for them to be called for by a project’s Registered Professionals of Record.

Thor Tandy’s presentation on the purpose and background of Scheduled ‘S’ was followed by a lively discussion among attendees.

Download seminar slides

Download Practice Note 16 (EGBC website)

Download fillable form Schedule S-B (AIBC website)

Download fillable form Schedule S-C (AIBC website)

 

 

© 2008-2024 Copyright Structural Engineers Association of British Columbia